| 項次 | 料號 | 數量 | 單位 | 需用日 | 小計 |
| | 品名規格 | | | 單價 | |
| 規格 | |
| 10 |
|
1 |
CS |
20261220 |
|
| | 生醫訊號數據收集、預處理與品質管理整合應用 | | |
________________ |
________________ |
| | 依據規格提供相關資料提供2期報告資料: 1.2026/11/10 提交期中報告 2.2026/12/20 提交期末報告
Working Items and Deliverables: 1.,,Midterm Report Content (November 2026): -,,IRB preparation and submission: Prepare the study protocol, consent f orms, risk assessment, and data handling plan. Deliver the IRB submissio n package and approval certificate when issued. -,,Experimental protocol: Define the clean baseline, motion, EMG, and po or electrode contact tasks, including session structure and recording du ration. Deliver a preliminary protocol, then a final version after the pilots. -,,Pilot datasets: Record 1–2 participants in each pilot round across t he planned scenarios. Deliver pilot datasets v1 and v2. -,,Pilot quality review: Check signal quality, scenario coverage, labels , and synchronization; document acquisition problems and protocol change s. Deliver a pilot data quality report. -,,Data format specification: Agree on file format, timestamps, synchron ized signals, and metadata needed by the AI pipeline. Deliver a written format specification before formal collection.
-,,Midterm Report Delivery Date: 2026/11/10
Working Items and Deliverables: 2.,,Final Report Content (December 2026): -,,Recruitment and scheduling: Recruit participants and arrange recordin g sessions. Deliver a subject scheduling record. -,,Formal data collection: Record the agreed scenarios and sessions unde r the final protocol. Deliver the raw, multi-session dataset. -,,Data quality control and storage: Check recordings, organize files, a nd maintain secure backups and versions. Deliver an organized dataset re pository. -,,Preprocessing: Apply the agreed filtering, segmentation, and alignmen t steps, and identify corrupted recordings. Deliver the processed datase t. -,,Dataset documentation and handover: Package the raw and processed dat a with labels, metadata, anthropometric information, and a description o f the files. Deliver the final dataset package and documentation to ITRI .
-,,Final Report Delivery Date: 2026/12/20
|
|